The Town of LaSalle is continuing with the annual Mill and Pave project for 2023. This year we will be working in  multiple areas throughout LaSalle, as shown below. 

 

Section A –  Gilbert Avenue, Gaylord Avenue, State Street, Vandernoot Avenue, Smith Crescent and Smith Street.

Work in this area includes catch basin repairs and  a mill and pave of the surface asphalt. Milling will be 40mm in depth, and 40mm of surface asphalt will be placed. Milling and paving in this area is scheduled for Tuesday May 23rd to Friday May 26th, weather permitting.

Paving machine and crew

The roads included are:

  • Gilbert Avenue: from Bouffard Road to Vandernoot Avenue
  • Gaylord Avenue: from Bouffard Road to Vandernoot Avenue
  • State St: from Gaylord Avenue to Smith Crescent
  • Vandernoot Avenue: from Mayfair Avenue to Gilbert Avenue
  • Smith Cr: from State Street to State Street
  • Smith St: from Smith Crescent to Reaume Road.

 Refer to Map A for location of work.

A Notice to Residents in the area has been distributed. 

Section B – Matchette Road: Bouffard Road to Laurier Drive:

Work in this area includes full depth mill and pave of the road way, and construction of six wheelchair ramps in the area. Milling will be 90mm in depth, and 50mm of base asphalt and 40mm of surface asphalt will be placed. Refer to Map B for location of work. Milling and paving in this area is scheduled to begin on Monday May 29th.

 A Notice to Residents in the area has been distributed. 

Section C – Martin Lane:

A number of different sections will be repaired along the eastbound lane of Martin Lane. The work in these areas includes both full depth and surface milling. Full depth milling will be 90mm in depth and surface milling will be 40mm in depth. 50mm of base asphalt and 40mm of surface asphalt will be placed. Refer to Map C for location of work. Milling and paving in this area is scheduled Tuesday May 23rd to Wednesday may 24th, weather permitting.

  A Notice to Residents in the area has been distributed. 

Section D – Morton Drive:

A number of different sections will be repaired along the eastbound lane of Morton Drive. Work in this area includes full depth milling and paving of the road. Milling will be 90mm in depth, and 50mm of base asphalt and 40mm of surface asphalt will be placed. Refer to Map D for location of work. 

Section E – Delmar Street:

Milling and paving of the westbound lane on Delmar St., between Malden Rd. and Ellist St., is scheduled for Monday June 12th. All businesses will remain open. Please use caution while travelling in this area, or use an alternate route where possible.

 

For more information about the 2023 Mill and Pave Project, or to provide your comments or concerns, please contact the Engineering department at 519-969-4143 between the hours of 8:30am - 4:30pm, Monday to Friday. Or use the Customer Service online portal anytime at www.lasalle.ca/customerservice.