Water and Wastewater Rates

The following charts show the various water and wastewater rates:

Fixed Quarterly Charges - Base Meter and Capital (Water Main Replacement) Charges

Item

2023 Rates

Capital Charges

$51.00

5/8" - 3/4" meter

$15

1" meter

$48

1 1/4 " - 1 1/2" meter

$60

2" meter

 $90

3" meter

$120

4" meter

$225

6" meter

$600

8" - 10" meter

$900

Water Consumption Charges (per Cubic Meter)

Item

2023 Rates

0 - 81 Cubic meters

$1.17

82 - 135 Cubic meters

$1.37

Over 135 Cubic meters

$1.49

Fixed Quarterly Charges - Wastewater Line Replacement Charges

Item

2023 Rates

Capital Charges

$40.50

Wastewater Consumption Charges

Item

2023 Rates

Sanitary Sewage Surcharge

100% of water consumption. For residential customers the Sanitary Sewage surcharge is capped at a maximum of 81 cubic meters of water consumption.

Water Quarterly Construction Charges

Item

2023 Rates

Water Construction Charges

A fixed fee of $120 per quarter is charged during the construction phase of a new residence 

2023 Water and Wastewater Rate Card

The Town of LaSalle water and wastewater rates have been set to cover the following:

Operational Costs

  • Water and wastewater system repairs and maintenance
  • Water and wastewater testing
  • Water purchases from Windsor
  • Wastewater treatment services

Capital Costs

  • Water main replacement
  • Hydrant replacement
  • Pump stations
  • Wastewater main replacement
  • Manholes

All water and wastewater operations follow Provincial regulations and standards to ensure safe and clean water.