The following charts show the various water and wastewater rates:
Item |
2024 Rates |
|
Capital Charges |
$55.50 |
|
5/8" - 3/4" meter |
$15 |
|
1" meter |
$48 |
|
1 1/4 " - 1 1/2" meter |
$60 |
|
2" meter |
$90 |
|
3" meter |
$120 |
|
4" meter |
$225 |
|
6" meter |
$600 |
|
8" - 10" meter |
$900 |
Item |
2024 Rates |
|
0 - 81 Cubic meters |
$1.19 |
|
82 - 135 Cubic meters |
$1.40 |
|
Over 135 Cubic meters |
$1.52 |
Item |
2024 Rates |
||
Capital Charges |
$45.00 |
Item |
2024 Rates |
Sanitary Sewage Surcharge |
100% of water consumption. For residential customers the Sanitary Sewage surcharge is capped at a maximum of 81 cubic meters of water consumption. |
Item |
2024 Rates |
Water Construction Charges |
A fixed fee of $120 per quarter is charged during the construction phase of a new residence |
The Town of LaSalle water and wastewater rates have been set to cover the following:
Operational Costs
Capital Costs
All water and wastewater operations follow Provincial regulations and standards to ensure safe and clean water.
The Town of LaSalle water meter program began in May 2014. The start up of the new program included upgrades to the water meter system by installing radio meter reading equipment on properties throughout the Town. The work was completed by CORIX Water Services.